Residential Construction

Plan your home around your plot, family, budget and future needs. Rudra coordinates planning, estimation, structural design review, materials and site execution under an agreed scope.

Illustrative modern residential house concept

From first discussion to handover

1. Understand the site

Discuss the plot, access, intended floors, spaces and budget. Verify survey, soil and approval requirements.

2. Agree the design

Prepare a site-specific plan and coordinate structural drawings with the qualified professionals required for approval.

3. Price the scope

Prepare quantities, specifications, exclusions and a written quotation with payment milestones.

4. Build and report

Coordinate procurement, labour and progress checks against the approved drawings and signed agreement.

CONCEPT STUDIES · NOT APPROVAL DRAWINGS

Two starting ideas for your home

These are illustrative space arrangements. Dimensions, openings, setbacks, stairs and structural elements must be developed for the actual plot and local approval.

A · Compact family home

Concept for a single floor, around 900 sq ft built-up area. Two bedrooms, an open living and dining space, kitchen and utility area. Room sizes follow a plot survey.

B · Growing family home

Concept for two floors, around 1,500 sq ft total built-up area. Ground floor living and one bedroom; upper floor family space, two bedrooms and terrace. Final circulation and structure need site-specific design.

ILLUSTRATIVE BUDGET · SEPTEMBER 2026

A sample construction estimate

Example only: 1,200 sq ft total built-up area × ₹2,100/sq ft = ₹25,20,000. The rate is a planning assumption used in the website calculator, not a market quote or fixed offer.

Illustrative allocation of ₹25,20,000
Work groupShareAmount
Foundation and structure35%₹8,82,000
Walls, plaster and waterproofing20%₹5,04,000
Doors, windows, floors and finishes25%₹6,30,000
Electrical and plumbing12%₹3,02,400
Site coordination and contingency allowance8%₹2,01,600
Illustrative total100%₹25,20,000

Before quoting: plot and soil conditions, drawings, specifications, location, access, schedule, GST treatment, transport, professional fees and approval charges must be confirmed. The allocations above are assumptions, not an item-wise BOQ. Scope and payment stages will be stated in writing.

Tell us what you want to build

Share your plot location, approximate size, required floors and budget range. We can then discuss a site visit and the drawings needed for a proper estimate.